EasyStreet

Call to Schedule a Showing

(813) 452-4096

(813) 452-4096

11823 Derbyshire Dr, Tampa, FL 33626

$478,000

Reduced By $28,000
last change 6/12/2025

Charming single-story home with a two-car garage and mature landscaping, including palm trees at 11823 Derbyshire Dr, Tampa, FL 33626
  • Bedrooms

    3

  • Baths

    2

  • Sq. Feet

    1744

  • Year Built

    1995

  • Days On Market

    81

  • $/SqFt

    $274

Less Photos /\

Tour This Home

Sun
15 Jun
Mon
16 Jun
Tue
17 Jun
Wed
18 Jun
Thu
19 Jun
Fri
20 Jun
Sat
21 Jun

Home Description

One or more photo(s) has been virtually staged. 100-Day Home Warranty coverage available at closing.Welcome to this charming home with a natural color palette throughout, creating a warm and inviting atmosphere. The kitchen features a center island, perfect for meal prep or casual dining. Other rooms provide flexible living space to suit your needs. The primary bathroom boasts a separate tub and shower, along with double sinks and good under sink storage. Outside, you'll find a fenced backyard with a covered sitting area, ideal for enjoying the fresh air. With fresh interior paint adding a touch of modernity, this home is sure to impress. Don't miss out on the opportunity to make it yours!

  • Private Pool: False
  • Water Feet: 0
  • Interior Features: Ceiling Fans(s),Eat-in Kitchen,Primary Bedroom Main Floor
  • Appliances: Dishwasher,Microwave,Other
  • Floor Covering: Carpet,Other,Tile,Wood
  • Exterior Features: Other
  • Exterior Contruction: Block,Stucco
  • Foundation: Slab
  • Front Exposure: Southwest
  • Roof: Shingle
  • Building Sqft: 1744

Available now at $478,000

Approximate Room Sizes / Descriptions

KitchenFirst
Living RoomFirst
Primary BedroomFirst
  • Attached Garage: True
  • Garage: True
  • Garage Spaces: 2
  • Garage Feature: None
  • Carport: False
  • Carport Spaces: 0
  • Air Conditioning: None
  • Heating: Central
  • Utilities: Electricity Available,Natural Gas Available,Water Available
  • Lot Sqft: 5994.00
  • Lot Acres: 0.1400
  • Total Acre: 0 to less than 1/4
  • Lot Num: 43
  • HOA Fees: $364 Annually
  • HOA Monthly Amount: $30
  • HOA/Community Assoc: Required
  • Senior Community: False
  • Style: Single Family Residence
  • Annual CDD FEE: $583
  • Maintenance Includes: Other
  • Pets Allowed: Yes
  • Max Pet Weight: 999
  • : Homes@opendoor.com

Neighborhood

The average asking price of a 3 bedroom Tampa home in this zip code is $581,886 (21.7% more than this home).

This home is priced at $274/sqft, which is 17.5% less than similar homes in the 33626 zip code.

Map | Street | Birds Eye

Print Map | Driving Directions

Financial

  • Approx Payment:$2,325*
  • Taxes:$4,275

Area Stats

These statistics are updated daily from the My Florida Regional MLS. For further analysis or to obtain statistics not shown below please call EasyStreet Realty at (813) 452-4096 and speak with one of our real estate consultants.

Listing Courtesy of OPENDOOR BROKERAGE LLC. For information or to schedule a viewing of this property (MLS# O6293747), call: 813-452-4096

11823 Derbyshire Dr, Tampa FL is a single family home of 1744 sqft and is currently priced at $478,000 . This single family home has 3 bedrooms. A comparable home for sale at 13409 Fawn Springs Dr in Tampa is listed at $597,000. In addition to single family homes, EasyStreet also makes it easy to find Homes, Condos, New Homes and Foreclosures in Tampa, FL. West Lake Townhomes, Arlington Park and Fawn Ridge Village are nearby neighborhoods. MLS O6293747 has been posted on this site since 3/26/2025 (today).

2025 6/15/2025.

Message Agent

Send

Schedule a tour

11823 Derbyshire Dr Tampa FL 33626

Choose a day and time

You Requested

We'll be in touch shortly to confirm your tour time and other details. Please let us know how to reach you.

Schedule Tour

CLOSE

Your message has been sent!

The agent will be in touch with you in just a minute.